ARDC Market Research Program Proposal (Draft)
Prepared for: ARDC (Chelsea Parraga and team)
Prepared by: Jim Idelson
Status: Draft (v0.1)
TL;DR (90 seconds)
What ARDC will get - A decision-ready understanding of participation, retention, and attrition in amateur radio, with a primary lens on: - A1: Licensed + Active - A2: Licensed but Inactive / Lapsed - Clear, evidence-based guidance on where the ecosystem leaks and what interventions are most likely to move the needle. - Optional, complementary insight into awareness and attraction outside amateur radio, split into: - B1: General population baseline - B2: High-potential adjacency segments - A reusable foundation for future waves (trendable core + longitudinal-ready design).
How we’ll run it (modules, not a black box)
This program is intentionally structured to deliver results throughout, not only at the end.
Each module ends with a sponsor-facing deliverable and a decision gate.
- M0 – Charter & Alignment → Research Charter + Insight Backlog + Plan/Gates
- M1 – Discovery Sprint → Hypothesis Map + Segmentation Framework + Fielding Options (v1)
- M2 – Qual Exploration → Qual Topline + Journey Breakpoints + Measures List
- M3 – Instrument Draft & QA → Survey v1 + Bias/Validity Review Memo
- M4 – Cognitive Test → Findings + Survey v2
- M5 – Pilot → Pilot Topline + Instrument Performance + Survey v3 (final)
- M6 – Fielding Pulse → Weekly pulse updates (composition, response, fixes)
- M7 – Analysis & Synthesis → Topline v1 + Segment Deep Dives + Opportunity Map
- M8 – Decision Kit → Report + Deck + Dataset/Codebook/Methods + Action Workshop
Engagement model options - Prime/Lead: Jim leads design, analysis, and recommendations; ARDC supports access/outreach. - Advisor: ARDC leads operations; Jim provides research architecture, QA, analysis, and synthesis. - Optional fielding partner (e.g., NORC / Westat) can be added if rigor/scale requires it.
Next step Approve Module 0 so we can finalize scope, decision uses, fielding approach, and the module plan.
Documents
Main proposal
Modules (milestone deliverables)
- M0 – Charter & Alignment
- M1 – Discovery Sprint
- M2 – Qual Exploration
- M3 – Instrument Draft & QA
- M4 – Cognitive Test
- M5 – Pilot
- M6 – Fielding Pulse
- M7 – Analysis & Synthesis
- M8 – Decision Kit
Appendices (rigor and reusable artifacts)
Graphics
- (placeholder) Program Map (modules + gates)
- (placeholder) Workstream Model (A1/A2, B1/B2)
- (placeholder) Lifecycle Funnel (recruit → activate → engage → retain → reactivate)
Notes (working assumptions)
- Workstream A is primary; Workstream B is complementary and may be scoped based on ARDC priorities and budget.
- Wave 1 will be designed to preserve optionality for future waves (trendable core + longitudinal-ready).